The development categories are divided into Schedule 1 and Schedule 2 as per table below: Schedule 1 includes larger scale projects and an EIA is compulsory. Schedule 2 includes smaller scale projects but more sensitive in nature. It’s discretionary and further criteria need to be assessed by the LPA before deciding.

Is an EIA required?

EIA is always required by developments covered by Schedule 1 to the 2011 EIA Regulations. These are usually large-scale projects or schemes with the highest level of potential environmental impact, for example airports, oil refineries and motorways.

What is li1652?

The Environmental Assessment Regulations, LI 1652, was promulgated in 1999 to give comprehensive legal cover to the Ghana Environmental Impact Assessment procedures. The objective of the LI is to ensure that such development activities are carried out in an environmentally sound and sustainable manner.

When to carry out an EIA?

Essentially, an EIA is designed to identify the potential risks of a project (e.g., infrastructure development such as a dam) to environmental and human well-being and identify measures to eliminate and/or mitigate these risks. This can be done by replacing and/or modifying planned activities to reduce impacts.

What are Schedule 1 drugs examples?

Some examples of substances listed in Schedule I are: heroin, lysergic acid diethylamide (LSD), marijuana (cannabis), peyote, methaqualone, and 3,4-methylenedioxymethamphetamine (“Ecstasy”).

What is meant by EIS and Fonsi?

The Environmental Impact Statement (EIS) is not a decision-making end in itself but a means to a decision-making end. A FONSI is issued when environmental analysis and interagency review during the EA process find a project to have no significant impacts on the quality of the environment.

How much does an EIA cost UK?

Costs here are usually between £1000 and £10,000 per project, depending on the environmental implications and the degree of detail and the type of studies Natural England requires, says Mr Hargreaves.

Is EIA only for developed countries?

At the beginning the practice of EIA was primarily confined to developed countries but it became increasingly familiar to people in the developing regions due to the active role of national and international organizations and media.

What is EPA do?

The U.S. Environmental Protection Agency (EPA) is responsible for the protection of human health and the environment. EPA: Provides technical assistance to support recovery planning of public health and infrastructure, such as waste water treatment plants.

How can I get permit from Environmental and Protection Agency in Ghana?

In-Person : Purchase the Environmental Assessment Registration Form from any Environmental Protection Agency (EPA) Regional and District Offices or the Head office in Accra or visit the EPA website to download website or click the link below to download (application form)

Is the first step in EIA process?

Screening is the first stage of the EIA process which results in a key EIA decision, namely to either conduct the assessment (based on the likely significant impacts) or not conduct it (in the anticipated absence of such impacts).

What is a schedule 1 and 2 drug?

Schedule 1: marijuana, heroin, LSD, ecstasy, and magic mushrooms. Schedule 2: cocaine, meth, oxycodone, Adderall, Ritalin, and Vicodin. Schedule 3: Tylenol with codeine, ketamine, anabolic steroids, and testosterone.