Easy tips

How long does planning permission take Waltham Forest?

How long does planning permission take Waltham Forest?

We aim to decide planning applications within: eight weeks for minor applications. 13 weeks for major applications. 16 weeks for major applications with an Environmental Impact Assessment (EIA).

Who controls Waltham Forest?

Waltham Forest Council is a Labour led local authority responsible for providing public services and political leadership within the London Borough of Waltham Forest.

Who is the head of Waltham Forest Council?

Cllr Clare Coghill
Role and responsibilities of the Leader of the Council The Leader of the Council is Cllr Clare Coghill.

How do I complain to Waltham Forest?

By writing to The Complaints Manager at Waltham Forest Town Hall, Walthamstow E17 4JF; By telephoning Waltham Forest Direct on 020 8496 3000, clearly stating that you wish to make a Stage 2 complaint; or. By sending an email to: [email protected].

What is permitted development in Waltham Forest?

Permitted development Some alterations, extensions or changes of use do not need planning permission. This is known as ‘permitted development’.

Do you need planning permission to remove a porch?

Thankfully for most porch designs, planning permission isn’t required. If you live in a house, the work is considered permitted development, providing that: The highest part of the porch does not measure more than three metres up from ground level, measured as you would an extension.

Who is mayor of Waltham Forest?

Elizabeth Baptiste

Waltham Forest London Borough Council
Mayor of Waltham Forest Elizabeth Baptiste, Labour since 22 April 2021
Leader of the Council Grace Williams, Labour since 2 September 2021
Chief executive Martin Esom since October 2010
Structure

Who is in charge of Waltham Forest Council?

Cllr Grace Williams is set to become the new leader of Waltham Forest Council after being backed by Labour group members in a vote last night. Former leader Clare Coghill, the first woman to lead the council, announced she was stepping down on 18th June.

Do you need planning permission for an outside toilet?

Yes, however, you will need to apply for Building Regulations. So, if you are planning a garden room with toilet, a bedroom with shower room or an annexe you will need to apply for Building Regulations.

What is the maximum size porch without planning permission?

three square metres
Adding a porch to any external door of your house is considered to be permitted development, not requiring an application for planning permission, provided: the ground floor area (measured externally) would not exceed three square metres.

https://www.youtube.com/watch?v=lvdWuZpoa0g

Author Image
Ruth Doyle