HS2 will transform transport links for Stafford and help regeneration around the station area. Travelling at up to 225mph on state-of-the-art trains, designed with today’s passenger needs in mind, HS2’s new rail services will make travel between Stafford and the capital possible in less than an hour. …

What route will the HS2 take?

Serving Britain’s largest cities and bringing extra capacity to their regions. The new HS2 high speed line will provide fast, frequent and reliable connections between 8 out of Britain’s 10 largest cities and their regions: Birmingham, London, Leeds, Manchester, Liverpool, Sheffield, Edinburgh and Glasgow.

What is the route of HS2 through Buckinghamshire?

HS2 through Buckinghamshire phase One of the HS2 route will run from London Euston to Birmingham with intermediate stations at Old Oak Common in west London, and near Birmingham Airport. phase 2a extends the route to Crewe. phase 2b extends the route to Manchester and Leeds.

Where is the new HS2 route?

HS2 will directly serve: Birmingham Curzon Street, Carlisle, Chesterfield, Crewe, Darlington, Durham, East Midlands Hub (Toton), Edinburgh, Glasgow, Interchange (Solihull), Lancaster, Leeds, Liverpool, Lockerbie, London Euston, Macclesfield, Manchester Airport, Manchester Piccadilly, Newcastle, Old Oak Common.

Is HS2 going through Drayton Bassett?

The Phase One route enters Staffordshire in the Drayton Bassett area, before passing through a number of rural parishes including Hints, Weeford, Swinfen and Packington, and Whittington. It continues north, to the east of Lichfield, after which the main line of Phase One merges into Phase 2a in the Fradley area.

Will HS2 stop at Crewe?

Under the current preferred route, the HS2 line will stop at Crewe, forming a HS2 Hub Station on the site of the existing station. Crewe would receive two HS2 services to London per hour, with a journey time of just 55 minutes, cutting 30 minutes off the existing journey time of 90 minutes.

What is the route of HS2 through Warwickshire?

The route travels on viaducts over the River Itchen and the Oxford Canal as it continues through the county. HS2 then travels north-west of Bascote Heath, including past Offchurch and Cubbington.

How many stops will HS2 have?

25 stations
HS2 trains will serve over 25 stations connecting around 30 million people. That’s almost half the population.

Where does HS2 tunnel start and finish?

The Chilterns tunnel will carry the High Speed 2 (HS2) railway line under the Chiltern Hills in England….Chilterns tunnel.

Overview
Crosses Chiltern Hills
Start West Hyde
End South Heath
Operation

What happened to HS1?

The government ended up taking LCR and its wholly owned subsidiary, HS1 Ltd, which was responsible for operating the line, back into public ownership in 2009. It then decided to sell HS1 Ltd, agreeing a 30-year concession with a group of Canadian investors in November 2010 for £2.1bn.

Who is constructing HS2?

Among the firms to already have been handed work on the project are contractors including Balfour Beatty, Mace, Vinci and Skanska, as well as consultants Lendlease, Mott MacDonald and CH2M. Here is HS2’s list of who’s got what so far.

Is HS2 phase 2 going ahead?

The bill for High Speed 2 (HS2) phase 2b’s western leg is currently scheduled to be deposited in Parliament in “early 2022 or sooner if possible”.

Where can I find information about HS2 in Staffordshire?

The following documentation contains information regarding proposed High Speed Rail 2 (HS2) routes throughout Staffordshire. View more about our stance on the High Speed Rail Proposals. More information regarding HS2 can be found on the official HS2 website.

How can I find out the route of HS2?

You can check maps to see the planned routes for the High Speed Two ( HS2) rail network. The route for Phase 1 has been confirmed. Plans for Phases 2a and 2b aren’t confirmed but are unlikely to change significantly.

Where is Phase 2 of HS2 going to be?

HS2 Phase Two is being delivered in 2 stages: HS2 Phase 2b (Crewe to Manchester, and the West Midlands to Leeds) On 30 November 2015, then Chancellor George Osborne confirmed the accelerated route from the West Midlands to Crewe, referred to as Phase 2a.

What’s the speed of the HS2 train from Stafford?

Travelling at up to 225mph on state-of-the-art trains, designed with today’s passenger needs in mind, HS2’s new rail services will make travel between Stafford and the capital possible in less than an hour.