Common questions

What are quantitative resources in control-M?

What are quantitative resources in control-M?

A quantitative resource represents a measure that can be quantified such as percentage of CPU, megabytes of storage, or number of tape drives. It provides the ability to avoid overwhelming the physical and logical resources in an environment by limiting the number of jobs that use the same resource at the same time.

What is tolerance in control-M?

Tolerance is for Cyclic Jobs that use the “run at specific times” cyclic option. The tolerance tells Control-M how much time can pass from the “specific time” where Control-M should still run that job. Example: Job is set to run at 7am and 8am with a tolerance of 15min.

What is Libmemsym in control M?

The %%LIBMEMSYM variable can be used in the Variable Assignment or Do Variable parameters to indicate a text file containing a list of Variable assignments. This variable enables you to create a central file containing Variable assignment statements that can be read by many job processing definitions.

What is order date in control M?

By default, the Control-M Scheduling Server for the run action is the same as defined for the folder. Value to be used as the original scheduling date for the job. The default is OrderDate (that is, the Control-M scheduled date).

Where can quantitative research be applied?

Quantitative research is widely used in psychology, economics, demography, sociology, marketing, community health, health & human development, gender studies, and political science; and less frequently in anthropology and history.

What is BMC Control-M?

Control-M simplifies application and data workflow orchestration on premises or as a service. It makes it easy to build, define, schedule, manage, and monitor production workflows, ensuring visibility, reliability, and improving SLAs.

What is Maxwait in control-M?

– Determines the number of extra days (beyond the original scheduling date) that the job is allowed to remain in the Active Jobs database while awaiting execution. – If the job still has not run after the specified number of days, the job is removed from the Active Jobs database.

What is BMC Control M?

What is dummy job in control M?

A dummy job (as in a Control-M job that is set to “run as dummy” or just tasktype = dummy) will not execute anything. It will just turn green/ok. Running jobs like this is meant to be a placeholder in the flow. You need to run your job as tasktype = command.